Previous short term studies:
Recent long term measurement, preliminary, Sos Enattos, 480 days:
Further info: https://mydrive.kfki.hu/f/7010f295a0/ and https://mydrive.kfki.hu/f/7aee233cf4/
Geotechnical baseline report (use industry standard): important for tunnel construction (to reduce risks) and gives also info about subsurface for NN estimates
Realistic sub-surface model to get NN curve (provided by GW scientists)
Estimate construction costs
Environmental impact study
Need local support: academia, political, funding agencies, industry, infrastructure (airport), local knowledge to build ET, local government
Electromagnetic noise – Schumann resonance (ionosphere): low frequency part of the Earth’s EM field spectrum
Propose 2 or 3 sites to ESFRI
Rules for partner countries and host country (s)
Involve CERN:
Use their expertise in vacuum, cryogenics, tunnel construction, financing
Show that we studied the option to build ET at CERN